Burndown vs Burnup Chart: What Is the Difference?

A burndown chart shows how much work is left in a sprint or project, falling towards zero over time. A burnup chart shows how much work has been completed, rising towards a line that marks the total scope. The burnup makes scope changes visible, because the total line moves when work is added.

How to read a burndown chart

The ideal line runs straight from the total at the start to zero at the end. A good burndown tracks close to that line. A flat stretch means nothing was finished; a late cliff means work was only closed at the end; a line that rises means work was added mid-sprint.

When a burnup chart is better

On a burndown, added scope and slow progress look the same: the line simply stops falling. A burnup separates them, with one line for completed work and one for total scope, which makes it the better chart for spotting scope creep.

  • Use a burndown for a fixed sprint, where the question is whether the team will finish.
  • Use a burnup for a release or a client project, where scope is likely to change.

In Worksynk

An active sprint in Worksynk has a board and a burndown, and velocity is derived from status categories rather than status names. If a sprint is about to end with a large share of its points still open, that also lowers the project's delivery confidence score.

[ FAQ ]

Common questions.

What is a burndown chart?

A burndown chart (also written burn down chart) plots the work remaining in a sprint against time. The line should fall to zero by the end of the sprint; comparing it with the ideal straight line shows whether the team is ahead or behind.

What is a good burndown chart?

One that stays close to the ideal line and falls steadily, showing work finished throughout the sprint rather than all at the end, with no unexplained rises from added scope.

Which is better, burnup or burndown?

Neither in general. A burndown is simpler and suits a fixed sprint. A burnup is clearer when scope changes, because it shows added work separately from progress.

/ Get started

Stop finding out about risk in the retro.

Score every project and catch scope creep early, without another status meeting.

Free, full platform
90 days
Nothing up front
No card
Guided walkthrough
20 min